Wednesday, November 11, 2009

House: Week Nine

DSC_4640It's a good thing we're building a house, because otherwise I would have nothing to post about here other then traveling. That traveling, and the associated busy schedule has meant that in the past three weeks I've made exactly three trips to the house. The good thing there is that every time I go, there's been tons of progress.

Since the pre-drywall walkthrough last week, they have: finished pouring the basement floor, put all the vinyl siding up on the sides and back, installed the cedar shakes and 90% of the stone on the front of the house, applied the exterior foundation insulation, put in the interior insulation, and hung all of the drywall.


DSC_4644That's getting after it.

It was pretty cool going through the house today, as the rooms really look like rooms now that the walls and ceilings have sheetrock. I'm excited to see what next week brings.